Monthly Archives: March 2011

The High Cost of Emergent Design/Subsequent Refactorings


In my previous post, I demonstrated that even with a lowered cost of change curve, change is still expensive. But, you might say, OK, we agree with that, so we’ll try to do more up front analysis and try to … Continue reading

Posted in .net, agile, asp.net, c#, cio, cto, software architecture, wpf, xp | Tagged , , , , , , , , , , | 6 Comments

A Flattened Cost of Change Curve: An economic analysis


Much has been written about how a lowered cost of change curve is a benefit. And it certainly is a benefit. However, change is still costly, in terms of both time and money, even with this lowered cost of change. … Continue reading

Posted in .net, agile, c#, scrum, software architecture, xp | Tagged , , , , , , , , , | 6 Comments